Built on Salt Lake City's building code

Know which permits your ADU needs — and which you can skip.

Planning a backyard cottage, basement unit, or garage conversion? Permitz tells you exactly which permits your accessory dwelling unit needs, what you can skip, and what it'll cost — a complete report for your exact address in 30 seconds.

Permit reports from $29

Per report. No subscription.

ADU permits aren't one form

An accessory dwelling unit is a small home — and the city treats it like one.

Attached or detached changes everything

A detached ADU is a standalone dwelling with its own building, electrical, plumbing, and mechanical permits. An internal conversion or attached unit follows a different path. Which one you're building determines every requirement that follows.

Zoning, size, and placement rules

Salt Lake City limits ADU size, height, setbacks, and parking based on your lot and zone, and many of these rules were reset by the city's 2023 ADU ordinance. Owner-occupancy still applies to most units, too. What's allowed on your parcel isn't what's allowed two streets over.

It's never just one permit

Most ADU projects trigger a stack of permits and inspections across the building, electrical, plumbing, and mechanical trades. Miss one and you're looking at a stop-work order or a failed final inspection.

Know exactly where your ADU stands

Most ADU projects stall on a zoning rule or a permit nobody flagged — usually after the owner has already spent money. Your report checks Salt Lake City's code against your exact address and answers the questions that keep you up at night, in plain English, in 30 seconds.

Can I even build one here?

We check your parcel's zoning, setbacks, height, and size limits — so you know what's actually allowed at your address before you fall in love with a plan or pay for drawings.

What can I skip?

We flag the permits and steps you're exempt from. Most owners quietly over-permit and overpay the city — you'll know exactly what you don't need.

What will the city ask for?

Every permit and document your ADU triggers, in plain English and in order — so your application doesn't get kicked back to the end of the line.

What's this going to cost me?

A fee estimate for every permit, up front. No blank checks, no surprises at the counter.

How it works

From project details to permit report in four simple steps

Describe Your Project

Tell us about your project and the property address.

AI Analyzes Requirements

Our AI instantly identifies all permits needed for your specific location and project type

Get Your Report

Receive a plain-English breakdown of every permit, document, and requirement — then chat with our AI to refine your results

Download & Apply

Download your PDF report and submit your application to the city with confidence

Simple, per-report pricing

Pay per report. No subscriptions. No hidden fees.

Permit Report

$29/ report

Everything you need to pull your own permit

  • Exactly which permits your project needs
  • Plain-English requirements — no code-speak
  • Find out if you can skip the permit
  • Official fee schedule and worksheets in one place
  • Every document you'll need to submit
  • Step-by-step: from application to approval
  • Ask our AI anything about your project
  • Downloadable PDF report
Get permit report$29
Most popular

Professional Report

$49/ report

Built for contractors who do this all day

  • Everything in Permit Report
  • Exact code references to back up every requirement
  • Contacts for every authority on your project
Get professional report$49

Salt Lake City ADU permit questions

Do I need a permit to build an ADU in Salt Lake City?

Yes. Every accessory dwelling unit in Salt Lake City requires a building permit, and detached ADUs typically also need separate electrical, plumbing, and mechanical permits. Exactly which permits apply depends on whether your unit is attached, internal, or detached, plus your lot's zoning. Your Permitz report lists every permit your specific project needs for your address.

How much do ADU permits cost in Salt Lake City?

Permit fees are based on your project's valuation and the trades involved, so they vary by project — building, electrical, plumbing, and mechanical permits are each priced separately, plus plan-review and impact fees. Your report includes a fee estimate so there are no surprises at the counter. The Permitz report itself starts at $29.

What's the difference between an attached and a detached ADU?

An attached ADU shares a wall with your main home or is converted from existing interior space like a basement, while a detached ADU is a standalone structure such as a backyard cottage or garage conversion. Detached units are treated as their own small dwelling and generally carry the most permit and inspection requirements. Your report is tailored to the type you're building.

Can I build an ADU on my Salt Lake City property?

Salt Lake City allows ADUs in most residential zones, but size, height, placement, and parking rules depend on your specific lot and zone. The fastest way to know what's allowed at your address is to run a report — it checks your parcel's zoning and tells you what applies.

How long does the ADU permit process take?

Timelines depend on the city's plan-review queue and how complete your application is — incomplete submittals are the most common cause of delays. Knowing every required permit and document up front is the single best way to avoid back-and-forth with the city, which is exactly what your report is for.

Do I need a contractor or architect to pull ADU permits?

Not always — homeowners can often pull their own permits for owner-occupied projects, though detached ADUs frequently involve structural and trade work where a licensed contractor or design professional is required. Your report flags where professional drawings or licensed trades are typically expected.

Permit your ADU with confidence

Stop guessing which permits your Salt Lake City ADU needs. Get a clear, AI-powered report for your exact address and project.